Conduct various inspections before power outage
1. Open the control station cabinet door and observe if the card is working properly and if there are any fault displays;
2. Observe and record the existence of faults from the real-time monitoring fault diagnosis of each operating station;
3. Check whether the power box works normally, whether the power fan works, whether the 5V and 24V indicators are normal, measure and record the voltage values;
4. Backup configuration, PID parameters, drivers, and other necessary important data;
5. Check the power supply redundancy, which includes AC power supply redundancy and DC power supply redundancy. AC power supply redundancy: By disconnecting one of the redundant AC~220VAC incoming lines, half of the AC power supply circuit of the system loses power, but the system should still be able to operate normally. The redundancy testing method for DC power supply is as follows:
(1) Firstly, disconnect one power supply box and measure the voltage of 5V and 24V on the power terminals of each cage and cage motherboard;
(2) First connect one power supply box, then disconnect the other power supply box, and then measure the voltage of 5V and 24V on the power terminals of each cage motherboard. The 5V output voltage of the power box should be between 5.10V and 5.25V, and the 24V output voltage of the power box should be between 23.00V and 25.00V. If the voltage deviation is large, it needs to be checked and handled in a timely manner, otherwise it will affect the normal operation of the card.
6. Check the network cable and layout, check the connection and disconnection of the network cable, confirm whether the connection is in good contact, and replace the faulty cable in a timely manner;
7. UPS test: Test the power supply capacity of the UPS battery by disconnecting the UPS AC incoming line. UPS batteries should be discharged regularly, generally recommended once a month. Discharge method: Disconnect UPS AC power supply and use battery power until the battery is about to be discharged.
The above checks mainly focus on understanding the operating status of the system in advance. If there are any abnormal phenomena, they can be promptly resolved during parking.
免责声明:
AMIKON我们销售新产品和停产产品,独立渠道购买此类特色产品。阿米控不是本网站特色产品的授权分销商、经销商或代表。本网站上使用的所有产品名称/产品图片、商标、品牌和徽标均为其各自所有者的财产。带有这些名称,图片、商标、品牌和徽标的产品描述、描写或销售仅用于识别目的,并不表示与任何权利持有人有任何关联或授权。
YOKOGAWA EB402-11 | YOKOGAWA VI451-11 | Honeywell RM7800 L 1087 |
YOKOGAWA UM330-00 | YOKOGAWA AAI135-H03 | Honeywell 51204174-175 |
YOKOGAWA SSB401-13 | YOKOGAWA AAI835-H03 | HONEYWELL 621-9990 |
YOKOGAWA 436006 R1000 | YOKOGAWA PW482-11 | HONEYWELL 51304335-200 |
Yokogawa AS. V8219TB | YOKOGAWA 2375A30 | HONEYWELL 621-9939 |
YOKOGAWA SEC401-11 | YOKOGAWA PW482-11 | MC-TDOY22 51204162-175 |
YOKOGAWA AAR145-S03 | YOKOGAWA 2375A30 | HONEYWELL 51204156-175 |
YOKOGAWA VI451-11 | YOKOGAWA EC401-11 | HONEYWELL 51401134-100 |
YOKOGAWA 237936 | YOKOGAWA ADV151-P13 | HONEYWELL 05701-A-0301 |
YOKOGAWA AAR145-S03 | YOKOGAWA AAM50 | Honeywell 05701-A-0301 |