DCS系统由硬件和软件组成。DCS系统的硬件安装包括盘、柜、机的安装和它们之间的连线,系统工作接地,电源及基本控制部分的安装,接地与隔离。

DCS系统安装的外部条件

 

1、 控制室和操作室应具备使用条件:

在安装前,控制室和操作室的土建、安装、电气、装修工程全部完工,室内装饰符合设计要求,空调机启用,并配有吸尘器;

其环境温度、湿度、照明度及空气的净化程度符合DCS系统运行条件才可开箱安装。

2、 对安装人员的要求:

安装人员保持清洁,到控制室或操作室工作换上干净的拖鞋,已防灰尘进入DCS系统装置内;

要尽量避免静电感应对系统元器件的影响,调试时,不穿化纤等容易产生静电的织物。

机、柜、盘运输与安装

 

  • 机、柜、盘要求整体运输到控制室,安装前拆箱。

  • DCS系统硬件包装箱在运输、开箱、搬运时小心,防止倾倒和产生强烈振动,以免造成意外损失。

  • 开箱时要有设备供应部门人员和接、保、检部门人员在场共同检查外观质量、设备内部卡件接线的缺陷、系统随机带来的文件、资料等,并做好记录,签字确认。

  • DCS系统控制室通常有500mm左右的防静电、防潮地板,因此要考虑好底座高度,并保证其稳定性和强度。

英文资料

The DCS system consists of hardware and software. The hardware installation of the DCS system includes the installation of panels, cabinets, and machines, as well as the wiring between them, system working grounding, installation of power supply and basic control parts, safety grounding and isolation.

External conditions for DCS system installation

1. The control room and operation room should have the following conditions for use:

Before installation, the civil, installation, electrical, and decoration works of the control room and operation room must be completed, and the indoor decoration must meet the design requirements. The air conditioning unit must be activated and equipped with a vacuum cleaner;

Only when the ambient temperature, humidity, lighting level, and air purification level meet the operating conditions of the DCS system, can they be unpacked for installation.

2. Requirements for installation personnel:

The installation personnel must maintain cleanliness, and when working in the control room or operation room, they must wear clean specialized slippers to prevent dust from entering the DCS system device;

Avoid the impact of Electrostatic induction on system components as much as possible. During debugging, do not wear chemical fibers and other fabrics that are prone to static electricity.

Transportation and installation of machines, cabinets, and panels

The machine, cabinet, and panel are required to be transported as a whole to the control room and unpacked before installation.

The DCS system hardware packaging box must be carefully transported, unpacked, and handled to prevent tipping and strong vibration, in order to avoid accidental losses.

When opening the box, personnel from the equipment supply department, as well as personnel from the reception, maintenance, and inspection departments, should be present to jointly inspect the appearance quality, defects in the internal card wiring of the equipment, documents and materials randomly brought by the system, and make records and sign for confirmation.

The DCS system control room usually has an anti-static and moisture-proof floor of about 500mm, so it is necessary to consider the height of the base and ensure its stability and strength.

免责声明:

AMIKON我们销售新产品和停产产品,独立渠道购买此类特色产品。阿米控不是本网站特色产品的授权分销商、经销商或代表。本网站上使用的所有产品名称/产品图片、商标、品牌和徽标均为其各自所有者的财产。带有这些名称,图片、商标、品牌和徽标的产品描述、描写或销售仅用于识别目的,并不表示与任何权利持有人有任何关联或授权。

GEIC694ALG392 本特利136711-02
GEIC694ALG233本特利136711-01
GEIC694ALG223 本特利136294-01
GEIC694ALG223BENTLY NEVADA136188-02
GEIC693PWR331本特利136188-02
GEIC693PWR330本特利135813-01
GEIC693PWR322本特利135137-01
GEIC693PWR321BENTLY NEVADA135137-01
GEIC693PTM101本特利133819-02
GEIC693PCM301本特利133819-01







站内搜索

证书荣誉

当前暂无信息

联系我们

  • 联系人: 吴工 女士
  • 话: 0592-5085207
  • 机: 18030175270
  • 资质公示 厦门阿米控技术有限公司 地址: 福建省 厦门市 思明区湖滨南路388号国贸大厦32D单元
  • 管理入口  技术支持:世铝网 长江有色
扫一扫,进入微商铺
您正在使用移动设备访问世铝网,您可以
浏览移动版,继续访问电脑版